A job gets sold and then waits for someone to gather the details, check crew availability, and get the customer on the calendar.
A job is marked sold in the field-service platform.
The job is on the schedule with a confirmed customer date and everything the crew needs already attached.
Jobs missing required information (permit, deposit, access details) route to a hold queue with the specific gap flagged, instead of blocking the whole scheduling process.
The field-service platform’s job record is authoritative for status and schedule. Nothing gets scheduled in a side calendar that isn’t reflected there.
Trigger a scheduling queue entry the moment a job is marked sold, with a checklist of required fields, and connect it to crew/material availability so scheduling becomes a confirm-not-build step.
Estimate using: sold jobs per week x average hours between "sold" and "on the calendar" today x hourly cost of the person doing that coordination. Compare to the time needed just to confirm an auto-suggested date.
Run the numbers →Bring the process that is costing you the most time. We’ll tell you whether it looks like a systems problem, a process problem, or something you should not automate.
If we're not the right fix, we'll say so on the call and point you somewhere better.